The end of the zero-interest-rate period (ZIRP) has caused an awkward shift in the Minimum Viable Product (MVP) model, forcing the tech industry to redefine how quality is defined in an era when capital is low, the software market is saturated, and switching costs are lower than they’ve ever been.